Comprising of 50KW solar and 11.6KW battery
Our installation was carried out by DAL in January 2023
DAL carried out the design (including compliance registration), installation & commissioning of the complete system with the minimum of fuss and absolutely no disruption to the running of the business.
Our aims for the project were:
· Improvement of the company sustainability credentials.
· Cost savings (particularly in the summer)
· Corporation Tax benefits.
The system has now been in place for more than 6 months and is fully meeting all of our objectives (including the charging of our electric vehicles from the solar array)
DAL have been reactive throughout and always met the timescales set.
We have no hesitation in recommending them for similar projects with our best wishes for future developments.
Should anyone wish to discuss our experience we are more than happy to help.
Philip Morris
Director
MLR Networks Ltd
Fill out the form, or call us to set up a meeting at
01925 450132
Thank you for contacting DAL Renewables.
We are extremely busy installing technologies across the UK, but we will aim to respond to your enquiry as soon as possible.
Best Wishes
DAL Renewables
We bring pride and passion to every project that we undertake, with a professional team of designers, project managers and tradespeople.
Tannery Lane, Penketh Warrington WA5 2 United Kingdom